FAQ
How do I add a Revision date to all Items at once?
A Project Revision date can be assigned to multiple items at one time by creating and assigning that date in the Spec Schedule.
- Step 1: Go to Spec Schedule, click 'Rev Date'.
- Step 2: Enter the Revision #, Revision Date, Description, Revision By and Checked By
Note: The Rev # must be a numeral. Do not use a letter designation
- Step 3: Click 'Save'.
- Step 4: Select the check box of the Item(s) to be assigned a Project Revision Date.
- Step 5: Click 'Rev Date'.
- Step 6: Click 'Assign' for the Revision Date to be applied to each item.
- Step 7: View the Revision Date is assigned in the Spec Schedule.